Scope of Work: Metal structure needed repairs to the lettering, surrounding edges, manufactured identical leafs that were missing, painted to match and replaced. Entire structure required cleaning throughout and a good established sealer that would not flake off as other attempts to seal have and failed. The project was a success and remains in good shape.